The advanced technology consists of depositing 3 layers of materials using a polyarticulated industrial robot: two layers of expansive foam serve as formwork for a third layer of concrete. Once the walls have been constructed, the foam is kept in place in order to insulate the house without thermal bridging. At the end of the operation, the mobile robot emerges through an opening provided for the fitting of the joineries.